Series 1 freight containers. Handling and securing Ingestion-build-71203 There has been a change
$174.00
Description
There has been a change to installation methods relating to the siting of the condensate drain
joint strength of attachments
American (ASTM
ISO 21466 specifies the structure model with related parameters
Minimum acceptable system accuracy
Series 1 freight containers. Handling and securing Ingestion-build-71203 There has been a change1 Scope This document specifies the methods of handling and securing series 1 freight containers built and tested to comply with ISO 1496 (all parts). Methods of handling and securing are described for both loaded and empty containers. The conditions for lifting different types of loaded and empty containers are laid down in Clause 6.
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.