US$ 4243.32
Safety rules for the construction and installation of lifts - Examination and tests. Landing doors fire resistance test Ingestion-build-48348 as well as in the
$116.00
Description
as well as in the event of foreseeable faults or malfunctions
It incorporates additional aspects not found in BS EN 50288-7
Form and conditions of delivery
Face images have been used for many decades to verify identity of persons
and independent assessors)
Safety rules for the construction and installation of lifts - Examination and tests. Landing doors fire resistance test Ingestion-build-48348 as well as in theThis European Standard specifies the method of test for determining the fire resistance of lift landing doors which may be exposed to a fire from the landing side. The procedure applies to all types of lift landing doors used as a means of access to lifts in buildings and which are intended to provide a fire barrier to the spread of fire via the lift well. The procedure of this standard allows for the measurement of integrity and if required the
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.
You may also like
US$ 17.95
US$ 27.91
US$ 10.64
US$ 254.04
US$ 168.65
US$ 921.93
US$ 4870.69
US$ 1359.73