Step, Assembly - Fuselage - Left Hand Condition:As Removed 093" from pin hole to
$173.95
Description
093" from pin hole to base of nut
PA28-140 S/N 28-20002 to 20280
The two Inspection Panels have an opening of 5" x 3 13/16" and placed on the Baggage Compartment floor over the area where the Entry/Exit Step Attach Bolts are located
Note: There are two types of Cylinders - Cylinders used on "smaller" Cessnas have -3 Straight Threads on the output Fitting
40 each - 420-722 (AN426AD4-4) Rivet
Step, Assembly - Fuselage - Left Hand Condition:As Removed 093" from pin hole toPart Installation of Fueling Steps, per Cessna Accessory Kit AK172 168J ($3385.) Good Condition "Only Used Once"
Shipping Notes
- Free Standard Shipping on $100+ Orders to the USA.
- Except Preorder products are shipped in 48 hours.
- Delivery to the USA:
- Standard Shipping : 3-10 business days
- If time is of the essence, please consider selecting expedited delivery for faster service.